Cedar Trail

Current FUTS Trail Projects - In Design



Description


Two short additions will complete the Cedar Trail along the south side of Cedar/Forest Avenue between West Street and Turquoise Drive. At the east end, a new aggregate trail has been constructed to fill-in a missing section between Gemini Drive and the existing Arizona Trail. At the west end, the existing sidewalk at the southeast corner of Forest Avenue and Turquoise Drive will be replaced with a 10-foot concrete trail.

Length


650 feet of new trail
1.36 miles: total length of Cedar Trail from West Street to Turquoise Drive
FUTS_Logo.png

Surface


Concrete / aggregate

Status / Schedule


Design is complete; construction is planned for 2013

Cost


$84,000

Funding


Funding for FUTS projects is provided by the 2000 Transportation Tax and the BBB Tax

Project Manager


Martin Ince
(928) 213-2685