Latest Blog Update

Water Reliability Today and Tomorrow banner_FINAL
LV Construction

To minimize road restrictions, two Water Services projects will be conducted simultaneously on Linda Vista Drive from March 30 to May 15. Water Services will replace a control valve with its protective vault between North Paradise Road and North Adrianne Way, and upgrade stormwater infrastructure within Spruce Avenue Wash. The Water Distribution upgrades will improve reliability of water services, support firefighting efforts in the area and move the valve and its vault out of the street, making future maintenance less disruptive and safer for maintenance crews. The stormwater upgrade will aid flood mitigation by increasing channel flow capacity.

With the current low traffic conditions, it is an ideal time to complete these projects and minimize inconvenience to residents in the area. 

To follow progress on this project, visit flagstaff.az.gov/lindavistawater

Kinlani Dorm and Linda Vista PRV


Reply to

Water Services Footer